  • How To Calculate Quantity Of Steel In Slab? -

    2.1M. 93K. 12. 3K. Search for: Search. How To Calculate Quantity Of Steel In Slab? 224 views; No comments; ... Engineering Discoveries Hello Everyone In This Video Show You That How To Calculate Quantity Of Steel In Slab Means Steel Calculation For Slab And Also RCC Slab Define, Keep Watching The Video. By Imperial System. By Metric System ...

  • How to Calculate Steel Quantity for Slab? -

    2020-7-14  Number of Top bars on Lx side = (Ly/5) / spacing + 1 = (4000/5) / 150 + 1 = 6 Nos. Length of top bar on Ly side = Clear Span of Slab (Ly) + (2 X Development Length) = 3000+(2*40*12) = 3000+960 = 3960 mm or 3.96 m. Bar Bending Schedule for Two Way Slab

  • What is quantity of steel required in 1 meter cube of ...

    About 100 kg per cum of concrete for estimate purpose How ever for footings —45 to 60 kgs/cum plinth beams — 90 kg/cum pedastelscloumns ——125 kg/cum columns ——————120 kg/cum staircases —————-110 kg/cum Roof Beams ————125 to 150 kgs /cum Roof Slaba...

  • How to calculate the quantity of steel for slab in 8000 ...

    Normal slabs are 12 to 15 cm thick so, 8000 x 0.12 =960 Cum specified steel comes to 95kg -105 kg per Cum Ans: 960 x 100 =96000 Kg or 96 tonne

  • Concrete Calculator - Estimate Cement, Sand, Gravel ...

    2020-2-3  Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

  • how much steel required for 1 square meter slab?

    Normally steel required for the slab is designed based on the type of slab the load factors.Normally for thumb rule at site we take as 15 kg / sq mtr. Is This Answer Correct ? 26 Yes : 5 No : how much steel required for 1 square meter slab?.. Answer / manoj mall. for 1 sqm slab steel

  • while measuring slab for concrete Quantity it is

    while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why? ALLInterview. Categories ... while measuring slab for concrete Quantity it is practiced that ... how much steel provide in 1m cube r.c.c . 3 Answers can you give me the details of rate analysis of steel and concrete? ...

  • How to Calculate Steel Quantity for Slab, Footing and ...

    2020-7-31  Estimation of steel reinforcement quantity for concrete slab, footing and column, beams etc. is crucial for the cost evaluation for the construction. Design drawings are used as a base for computing rebar quantity in different structural elements. This article presents steel quantity computation process for slabs, columns, and footings. Ad Free!

  • How many kg of steel reinforcement in one cubic

    well , reinforcement steel required for slab is nearly 0.7 to 0.8% of the volume of concrete so if concrete is 1 cum then steel will be 1*0.7/100 =0.007 but density of steel is 7850 kg/ cum so 0 ...

  • How To Calculate Cement Bags In 1 Cubic Meter?

    2016-12-21  Any one please send mix design for m30 grade of concrete using 1%, 1.5%,2% crimped Steel and poly propylene fibres Farjad January 25, 2018 at 3:19 pm

  • How to Calculate Steel Quantity for Slab? -

    2020-7-14  How to Calculate Steel Quantity for Slab? – Reinforcement Calculation . In this post, we are going to explain how to calculate steel quantity for the slab? For b oth one way and two way slab with an example. Note: For Better View, Please read this post in landscape mode if you are on the mobile device.

  • For one meter cube of concrete how much kg steel is ...

    Eg:- Load (tensile force) on beam is slightly greater than load on slab so, steel quantity in beam is slightly more than slab. Likewise in every structural elements. Therefore, Slab /lintel——0.7 to 1.0% (55 to 78.5kg)/m^3. Columns_____0.8 to 6.0% (62.80 to 471kg)/m^3. Beam _____1.0 to 2.0% (78.5 to 157kg)/m^3

  • Calculate Quantities of Materials for Concrete

    2020-7-29  Quantities of materials for concrete such as cement, sand and aggregates for production of required quantity of concrete of given mix proportions such as 1:2:4 (M15), 1:1.5: 3 (M20), 1:1:2 (M25) can be calculated by absolute volume method. This method is based on the principle that the volume of fully compacted concrete is equal to []

  • Billing of Quantities (BOQ) Types Example BOQ ...

    Calculation of materials for Reinforced Concrete Construction . Materials requires for reinforced concrete are cement, sand, coarse aggregate and steel.Let us assume a standard quantity of 1m 3 Cement mortar and a mix proportion of 1:1.5:3 (1 part Cement, 1.5 parts Sand 3 parts CA). The quantity can preferable calculated by two methods, which are weight volume method.

  • Thumb Rules used in the Construction by Civil

    2018-12-14  As per the above table, the steel quantity of slab is 1% of the total volume of concrete utilized. Thumb rule to calculate Steel quantity of above slab = Volume of Concrete x Density of Steel x % of Steel of Member. Steel quantity required for above slab = 3 x 7850 x 0.01 = 235Kgs. For accurate calculation, you can refer to Bar Bending Schedule

  • Concrete Calculator - Estimate Cement, Sand, Gravel ...

    2020-2-3  Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

  • how must steel will use for 1 cubic meter.formula of

    Required steel in concrete is Depend on Types on concreting different structure For Example, R.c.c Slab = 0.5 to 1 % steel Required in volume of concrete R.c.c Beam = 1.8 to 2% % steel Required in volume of concrete R.c.c column = 2.5 % % steel Required in volume of concrete R.c.c Road = 0.6 % % steel Required in volume of concrete

  • How much steel ( 10mm and 8mm) required for 1 M3

    quantity of steel is different in different structural elements because load tensile force taken by different element are different 61 to 68 kg m3. ... How much percentage of steel is added to 1m cube of concrete slab? I want to construct a 36×26 feets slab . Pls tell me how much steel nd cement required for it?

  • How many kg of steel reinforcement in one cubic

    well , reinforcement steel required for slab is nearly 0.7 to 0.8% of the volume of concrete so if concrete is 1 cum then steel will be 1*0.7/100 =0.007 but density of steel is 7850 kg/ cum so 0 ...

  • How to Calculate Quantities of Cement, Sand and

    2020-7-30  Incase you want to convert the requirement of Sand and Aggregate in Cum; 1 Cum = 35.31 Cft Eyeopener:Many popular blogs claim M20 nominal mix as 1:1.5:3 ,however we strongly differ by same.Through this blog,we are also trying to address the same myth which is being carried forward since last 4 decades.. The reason being: With constant research and development in the field of cement

  • How much steel ( 10mm and 8mm) required for 1 M3

    quantity of steel is different in different structural elements because load tensile force taken by different element are different 61 to 68 kg m3. ... How much percentage of steel is added to 1m cube of concrete slab? I want to construct a 36×26 feets slab . Pls tell me how much steel nd cement required for it?

  • Thumb rule for steel qty for 1m2 in kg/m2 column

    Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam. Question Posted / krishnan41cbe. 0 Answers ; ... 12mm diameter iron bar having 1m length how much kg weighted ? ... 3

  • How To Calculate Cost Of Concrete Work - Civiconcepts

    2020-7-7  Cost of sand for 1 m 3 = As per present market rate, cost of 1 m 3 of sand is taken as Rs: 1400 = 0.42 X 1400 = 588 Rs. Cost of course aggregate for 1 m 3 = As per present market rate, cost of 1m 3 of course aggregate is taken as Rs.2400 = 0.84 X 2400 = 2016 Rs. Therefore, total cost for 1m 3 of M – 20 concrete is =Cost of cement + sand ...

  • Mf-2372 High Quality Adjustable Concrete Steel

    Introduction of Steel Formwork. 1.Concrete metal formwork is made of Q235 steel plate which is heavy/light duty formwork system for concrete wall, beam, slab and column. 2.There are some ribs in the middle of metal formwork which can strengthen the formwork more steady. 3.Coined edge can help to form a perfect concrete finish without bubbles.

  • How Much Cement Required For One Square Meter

    In order to calculate the required quantity of cement plastering, we have to follow the following 3 simple steps. Step 1:-Assumptions. Area of Plaster = 1 m². Thickness of plaster = 12 mm =0.012 m. Mix Ratio → 1:4. Step 2:- Quantity of Plaster ∵ Volume of plaster = Area of plaster x Thickness of plaster. Volume of plaster = 1 x 0.012=0.012 m³

  • 16 Different types of slabs in construction Where to

    2017-5-21  Step 3: The gaps between the bricks are called a rib. Reinforcement is provided in a form of the beam within the gap. Step 4: After placing the rib, the plain steel mesh is placed on the entire slab area resting on ribs. Step 5: Now pouring of concrete is done on a slab. Where to use Hardy Slab? Hardy slab is used where temperatures are very high.

  • Concrete slab calculation - KnowledgePoint

    Assume water/cement ratio of 0.45 BY WEIGHT for a slab mix, so the water volume will be about 1.4 parts by volume, or 1.4 water: 1 cement: 2 sand: 3 coarse aggregates, 7.4 parts total. For 0.15 m^3, you need about 0.15/7.4 or about 0.021 m^3 of cement. That will be about 66 KG of cement, or a little more than one 50-kg sack (a common size).

  • Analysis Rates, Analysis and rates for construction

    3)Reinforcement work for R C C –1 blacksmith or fitter and 1 beldar can bend and place in position 1 quintal (2 cwt) of steel per day. d) Stone work per 2.83 cum (100cuft)- Random rubble masonry with blue stone in foundations-3 masons, 3 beldars, 2 mazdoors and 1/4bhisti can do 2.83 cum (100cuft0 per day . e) Brick work per 2.83 cum (100cuft)-

  • Example 2: Design the roof slab, beam and column of

    2011-2-15  • Maximum spacing for main steel in one way slab according to ACI 7.6.5 is minimum of: i) 3hf =3 × 5 =15″ ii) 18″ Therefore 6″ spacing is O.K. • Maximum spacing for shrinkage steel in one way slab according to ACI 7.12.2 is minimum of: i) 5hf =5 × 5 =25″ ii) 18″ Therefore 9″ spacing is O.K. (2) Design of slab “S1”:

  • How to Calculate Quantities of Cement, Sand and

    2020-7-30  Incase you want to convert the requirement of Sand and Aggregate in Cum; 1 Cum = 35.31 Cft Eyeopener:Many popular blogs claim M20 nominal mix as 1:1.5:3 ,however we strongly differ by same.Through this blog,we are also trying to address the same myth which is being carried forward since last 4 decades.. The reason being: With constant research and development in the field of cement

  • Thumb rule for steel qty for 1m2 in kg/m2 column

    Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam. Question Posted / krishnan41cbe. 0 Answers ; ... 12mm diameter iron bar having 1m length how much kg weighted ? ... 3

  • FIND COST FOR A RCC SLAB - College Study Notes

    Wet volume of concrete = Volume of RCC slab – Volume of steel. Volume of RCC slab = l x b x h = 8 x 4 x 0.115 =3.68 m 3. Density of steel 1m 3 = 7850Kgs. Wet Volume of concrete = 3.68 – 0.038. Wet volume of concrete = 3.642 m 3. As the materials are available in dry condition so we will calculate for dry concrete . 1m 3 of dry concrete ...

  • How Much Cement Required For One Square Meter

    In order to calculate the required quantity of cement plastering, we have to follow the following 3 simple steps. Step 1:-Assumptions. Area of Plaster = 1 m². Thickness of plaster = 12 mm =0.012 m. Mix Ratio → 1:4. Step 2:- Quantity of Plaster ∵ Volume of plaster = Area of plaster x Thickness of plaster. Volume of plaster = 1 x 0.012=0.012 m³

  • Concrete slab calculation - KnowledgePoint

    Assume water/cement ratio of 0.45 BY WEIGHT for a slab mix, so the water volume will be about 1.4 parts by volume, or 1.4 water: 1 cement: 2 sand: 3 coarse aggregates, 7.4 parts total. For 0.15 m^3, you need about 0.15/7.4 or about 0.021 m^3 of cement. That will be about 66 KG of cement, or a little more than one 50-kg sack (a common size).

  • Concrete Calculator - how much concrete do you

    Free online concrete calculator for your construction projects. Calculate the required weight and volume of readymix concrete you need for your wall, column, steps, slabs, footings, and others. Easy to use calculator for how much concrete you need in cubic feet, cubic yards, cubic meters, tons, tonnes, as well as bags of concrete of different sizes.

  • How to calculate cement, sand and coarse aggregate

    2020-7-31  For the above slab volume ( 5m x 2m x 0.1m) = 1 m 3. We need 1 m 3 of wet volume concrete of M20 Mix, (Mix Ratio, M20 = 1: 1.5 : 3) So Total Parts = 1+1.5+3 = 5.5 Parts which gives Dry volume that means before adding water content. We have discussed the effect of water on concrete. Adding Void Ratio Compressibility

  • Civil Work - CONCRETE GRADE: M5 = 1:4:8 M10=

    1m-3.28ft 1sq.m-10.76sq.f t 1cu.m-35.28cu.f t 1acre-43560sq.f t ... 1 M LENGTH STEEL ROD I ITS VOLUME V=(Pi/4)*Dia x DiaX L=(3.14/4)x D x D X 1 (for 1m length) Density of Steel=7850 kg/ cub meter Weight = Volume x Density=(3.14/4)x D x D X 1x7850 (if D is in mm ) So = ((3.14/4)x D x D X ... 13. 3"tk precast slab M15 324*0.075 24.30Kg0.49 14. GC ...

  • How To Calculate Cement Bags In 1 Cubic Meter?

    2016-12-21  Any one please send mix design for m30 grade of concrete using 1%, 1.5%,2% crimped Steel and poly propylene fibres Farjad January 25, 2018 at 3:19 pm

  • RCC Calculator Estimate Cement, Sand, RCC Online

    Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree, you can also

  • Minimum Standards for Structural Design RCC

    b) Two Way Slab: Main Steel 8 MM bars @ 5″ C/C and Distribution Steel of 8 mm bars @ 7″ C/C. 4. Foundation: 6″ of PCC layer comes first. Over than, a tapered or rectangular footing of 12″ thickness is minimum. Steel mesh of 8 mm bars @ 6″ C/C should be laid. In a 1m X 1m footing, this would consist of 6 bars of 8 mm on both portions ...